2021 PROJECTS AND CURRENT ROAD CLOSURES



Road Closures



66
65
38
80
52
RB8
47
29
64
129
16
RB8
18
3
34
Big Red Park
Breeze Basin
Buffalo Pass
California Park
Deep Creek to Wolf Mtn
Dunkley Pass
Emerald Mountain
Fish Creek
Hinman Prk/Seedhouse
Little Snake/Columbine
Lynx Pass
Ripple Creek Pass
Sarvis Creek
Sunnyside
Spring Creek
Closed
Open
Open
Open
Open
Closed
Closed No MV
Open
Open
Open
Open
Closed
Closed
Closed
Closed




2021 Road Closure


NOTICE OF TEMPORARY ROAD CLOSURE ENDED

 CR 18 from near Stagecoach Reservoir Dam to Pleasant Valley

 Routt County Road 18 – Effective June 7, 2021, the temporary closure of Routt County Road 18 from Stagecoach Reservoir dam to Pleasant Valley is ended. The roads are open to all traffic.  Be advised that the road has sections that may require higher clearance vehicles, and areas that may be impassable during times of inclement weather

2021 Project Schedule

 

Routt County Road and Bridge has the following projects planned for the 2021 construction season.

Minor Bridges -  Replace two culvert crossings near Steamboat Springs in Routt County on County Road (CR) 33 just south of the intersection of CR 33 and CR 33A.  The Cow Creek Culverts will start and be completed in 2021. Construction should begin in late summer and be completed by the fall.  Expect closures and alternate routes.

Crack Seal - Crack seal application to various roads as part of preventive maintenance to preserve asphalt pavement, April – May.

Dust Suppression - Apply dust suppression to the County’s higher volume unpaved roads beginning week of May 24th.  This project will last approximately 6 weeks (weather permitting).

Annual Road Striping – Annual striping of roads in road striping program. Begins June 20th for 3 weeks. Paved roads that receive overlay this year will be striped in September.

Asphalt Patching - Annual patching to repair roads in need.  This will begin approximately July 12th.

Overlay -        Scheduled to start in August.  Approximate mileage listed below.

                     CR 129  City Limits to Hot Springs Creek, 3.4 miles.  

                     CR 41    CR 35 to 41A, 1.5 miles.

                     CR 38     Buffalo Pass Road, 0.5 miles

                     CR 36    Shelf Road to Soda Creek, 1.9 miles.

                     CR 33    CR 33A to City Limits, 3.9 miles.

                     CR 22    CO 131 to CR 14, 1.0 mile

Chip Seal-      Scheduled to start in July.  Approximate mileage listed below.

                       CR 64   Seed House Road, 6.0 miles

                     CR 76   The Cog, 2.65 miles

                     CR 129  CR 54 to Moon Hill, 1.0 mile

 

Tree Haus Bridge Painting – Tree Haus Bridge will receive treatment to the timber structural members.  This will consist of sanding the wood of the structural members as re-staining with a wood preservative.  Expect lane closures and flaggers in the area during the work.

                                 

All of the dates are subject to change for weather and contractor scheduling.  There will be various other projects going on throughout the county this summer.  We are working hard to maintain our County Roads for the safety of the traveling public.  Thanks for your patience during construction.  Please watch for and abide by flaggers, construction signs, and detours.

 

.