Go To Search
Click to Home

County Connect
Routt County, Colorado
P.O. Box 773598
Steamboat Springs, CO 80477
Ph: (970) 879-0108
Fx: (970) 879-3992

ROAD & BRIDGE 2017 PROJECTS

2017 Projects Schedule

Major Bridges  - schedule in progress

Crack Seal - County crews apply crack seal  to paved roads as part of preventive maintenance to preserve asphalt pavement, April – May.

Dust Suppression -  County crews combined with a contractor apply mag chloride for suppression to the County’s higher volume unpaved roads in May - June. 

Annual Road Striping The County selects a striping contractor to stripe roads in two sessions. The first as soon as weather and schedules allow around June and the second after the overlay and chip seal projects in September. 

Asphalt Patching - County crews patch and repair asphalt roads as part of the pavement maintenance program.

Overlay/ Chipseal - July through August.

Culvert Replacement - Annual culvert replacements to maintain drainage ways.

Gravel Roads Annual regravel of roads by County crews.


Thanks for your patience during construction.

Please watch for and abide by flaggers, construction signs, and detours.